Free Engineering Tool
Software Scope and MVP Timeline Calculator.
Built by ALGOFACT’s solution engineering team, this calculator estimates discovery, Proof of Concept (PoC), and MVP build weeks along with the recommended engineering roles based on your platform, role model, ERP/CRM integrations, AI scope, and ISO 27001 / KVKK / GDPR security controls.
1. Select Project Parameters
2. Engineering Scope & Timeline Output
10–19 Weeks (Estimated First Production Release)
Complexity Tier: Midmarket Enterprise / B2B Platform (65/100)
- Discovery & Arch
- 1–2 wk
- PoC (Risk Test)
- 1–2 wk
- MVP Build
- 8–15 wk
Recommended Engineering Team
- Solution Architect (Part-time)
- Senior Software Engineer (Backend & API)
- Frontend Engineer
- AI / ML Engineer (PyTorch, RAG, MLflow)
- DevOps & ISO 27001 Infrastructure Engineer
Primary Scope & Cost Drivers
- Platform scope (web)
- Authorization & organization model (3-5 user roles)
- External system, data schema, and retry/queue integrations
- Data readiness, held-out evaluation dataset, and model monitoring (MLOps)
- KVKK / GDPR / ISO 27001:2022 audit logging and data residency controls
What Engineering Factors Drive Software and MVP Timelines?
Real delivery timelines in enterprise software and AI are governed less by screen count and more by data contracts, role-based access control (RBAC), external ERP/CRM/HIS integrations, and production observability requirements.
Every ALGOFACT engagement starts with a 30-minute discovery call and a founder-led written scope presentation. Where model performance or legacy integration carries technical risk, we run a bounded 1–2 week PoC before committing to the full build.
Frequently Asked Questions
01Why does the calculator output engineering weeks and team roles instead of a generic dollar figure?
Generic price tags on calculators are almost always misleading because they ignore data readiness, tenancy isolation, and integration depth. We show the exact engineering phases and team composition up front, then provide a written fixed-scope or phased proposal after a 30-minute discovery call.
02When is a Proof of Concept (PoC) phase required?
Whenever value depends on a machine learning model, computer vision accuracy on a production line, an LLM/RAG assistant over internal documents, or an undocumented legacy ERP integration.
03Who owns the source code and cloud accounts after the MVP ships?
You do. Repositories, cloud accounts, CI/CD pipelines, and operations runbooks sit in your organization’s name from day one.
04How do you deliver for teams in the US and Europe?
ALGOFACT (Algofact Software and Technology Inc., Dover, DE) runs engineering from Adana and Ankara TEKMER in Türkiye (UTC+3) under ISO/IEC 27001:2022, overlapping with European business hours and US East Coast mornings.
Tell us about your project.
A 30-minute discovery call, followed by a founder presentation.
Book a discovery call
